top of page
3D Engineering and Mammoet Crawler Crane Precision Drive CCU Plant Construction at Heidelberg Materials’ Lengfurt Site
Mammoet leveraged advanced 3D engineering and a high-capacity crawler crane to safely install massive components at Germany’s first large-scale carbon capture and utilization (CCU) plant, supporting Heidelberg Materials and Linde’s decarbonization strategy.

the-inaugural-large-scale-carbon-capture-utilization-ccu-plant-has-been-established-for-the-german
bottom of page
