top of page
Unbiased News Banner_edited.jpg
Crane Hub - Crane News

Crane Industry News Latest Global Updates, Lifts, Accidents
& Market Insights

Crane Hub Global delivers trusted crane industry news from job sites, ports, project locations, and markets worldwide covering heavy lifts, specialized transport, maritime cranes, equipment deliveries, safety and operations, workforce development, and key industry moves.

Global reach. Local impact. Powered by the industry’s largest social media community.

 

Updated daily by the Crane Hub Global editorial team.

Do you have Crane News?

Liebherr Cranes

Reach Out To Our Editorial Team!

We invite you to connect with the Crane Hub editorial team to share your news, content, or press releases. Your insights and stories are valuable to us, and we believe they can enrich our community. Don't hesitate to reach out and let us know how we can collaborate to bring your message to a wider audience. Together, we can highlight the stories that matter most!

Engineering Precision in Miami’s Design District: NACR Deploys Liebherr MK-140 for Cartier Boutique Installation

Feb 10
3 min read

30-Second Takeaway


North American Crane & Rigging (NACR) successfully executed a complex installation at Cartier’s flagship boutique in Miami’s Design District using a Liebherr MK-140 mobile construction crane. The project demonstrates how advanced crane technology, custom rigging, and disciplined coordination come together to deliver safe, precise lifts in tight urban environments.



Precision Lifting in Dense Urban Environments


Not every lift can be solved with standard equipment. In high-density urban districts, where access is limited, sightlines are restricted, and precision is critical, success depends on both the right machine and the right team.


That reality was on full display in Miami, Florida, where North American Crane & Rigging (NACR) deployed a Liebherr MK-140 for a complex installation at Cartier’s flagship boutique in Miami’s Design District.


The project marks the first in a multi-part series showcasing how advanced crane technology and disciplined execution come together on challenging urban jobsites.


NACR’s Mission in Action


Founded in 2015, North American Crane & Rigging has steadily built its reputation through investment in innovative crane and rigging equipment and an experienced team focused on:

  • Safety-first execution

  • Personalized customer service

  • Value-driven lift planning

  • Complex project delivery


The Miami project required careful planning, creative rigging solutions, and flawless coordination in a live urban environment.


NACR operates from locations in:

  • Providence, Rhode Island

  • Fall River, Massachusetts

  • Lakeland, Florida

  • Orlando, Florida


The company provides crane services, specialty and industrial rigging, heavy hauling, and engineered lift solutions across the northeastern and southeastern United States.


Why the Liebherr MK-140 Was the Right Choice


For this project, NACR selected the Liebherr MK-140, a crane engineered specifically for environments where traditional mobile or tower cranes face limitations.

The MK-140 combines tower crane reach with mobile crane flexibility, allowing rapid deployment while maintaining exceptional lifting precision.

MK-140 Technical Specifications


Key performance callouts include:

  • Crane Type: Mobile Construction Crane (MK Series)

  • Maximum Load Capacity: ≈ 17.2 tonnes (38,000 lb)

  • Maximum Hook Height: ≈ 94 m (308 ft) with jib

  • Maximum Radius: ≈ 65 m (213 ft)

  • Tower System: Telescopic mast with variable jib configurations

  • Operator Cab: Elevating, height-adjustable cab for improved visibility

  • Setup Advantage: Rapid mobilization without tower crane foundations

  • Control & Safety Systems: Advanced load moment limitation and integrated monitoring


The crane’s adjustable cab provides the operator with commanding visibility, improving accuracy and reducing blind spots in tight urban conditions.


Executing the Lift: Cartier Glass Façade Installation


The project required the precise placement of Cartier’s glass façade panels, a lift demanding controlled movement and careful handling.


NACR utilized custom-fabricated rigging, designed specifically for the glass components, to ensure:

  • Even load distribution

  • Stability throughout hoisting

  • Protection of sensitive façade materials


With clear sightlines from the elevated cab and coordinated communication between the operator, rigging crew, and site supervision, each panel was hoisted and secured efficiently, meeting both structural and aesthetic requirements.


Engineering Meets Execution


This Lift of the Month demonstrates how advanced crane design, experienced crews, and disciplined planning converge to solve complex lifting challenges.

From the MK-140’s hybrid crane architecture to NACR’s tailored rigging approach, every element contributed to a safe and successful outcome.


As the completed façade now stands in Miami’s Design District, it represents more than architectural vision it reflects the alignment of planning, technology, and execution that defines NACR’s approach to every project.


About North American Crane & Rigging


North American Crane & Rigging (NACR) is a U.S.-based provider of crane services, specialty rigging, heavy hauling, and engineered lifting solutions. Founded in 2015, the company supports complex urban, industrial, and infrastructure projects across the northeastern and southeastern United States, with a strong focus on safety, precision execution, and customer-driven service.


About Liebherr


Liebherr is a global leader in crane manufacturing and heavy equipment technology. Its MK Series mobile construction cranes are designed to deliver tower crane reach with mobile crane flexibility, supporting demanding lifting applications in urban construction, industrial installations, and high-precision environments.



Frequently Asked Questions


What crane was used for the Cartier installation in Miami?

NACR used a Liebherr MK-140 mobile construction crane for the glass façade installation.


Why is the MK-140 suited for urban lifting projects?

The MK-140 combines tower crane reach with mobile flexibility, offering rapid setup, excellent visibility, and precision control in restricted city environments.


What was the lift scope at Cartier’s flagship boutique?

The project involved the precise placement of large glass façade panels requiring custom rigging and controlled hoisting.


Where does North American Crane & Rigging operate?

NACR operates from Rhode Island, Massachusetts, and Florida, supporting projects nationwide.

Explore the Crane Hub News Archive for more global crane and heavy lift coverage.

Related Topics
 

Click a tag to discover more crane industry coverage

Stay Ahead of the Lift

Subscribe to Crane Hub for global crane industry news, insights, and stories about people shaping lifting worldwide

One Subscription. Total Industry Visibility

bottom of page