Mammoet Begins Major Bridge Replacement at Amsterdam Centraal Station
- Meagan Wood

- Dec 17, 2024
- 5 min read
Updated: Jan 1
30-Second Takeaway
Heavy lift specialist Mammoet has begun a critical bridge replacement project at Amsterdam Centraal Station, one of Europe’s busiest transport hubs handling approximately 30 million passengers annually. Using advanced heavy-lift engineering, modular cranes, and precision lifting techniques, Mammoet will remove the aging pedestrian bridge and install a new structure designed to improve safety, durability, and passenger flow while respecting the station’s historic architecture.

A Critical Upgrade at a European Transport Landmark
Amsterdam Centraal Station is more than an architectural icon it is a vital artery in the Netherlands’ transportation network. With millions of commuters and visitors passing through every year, the station’s infrastructure must operate flawlessly.
The pedestrian bridge now being replaced plays a key role in connecting different areas of the station. While visually iconic, the existing structure no longer meets modern demands for capacity, safety, and long-term durability. As passenger volumes continue to rise, replacing the bridge is essential to maintaining reliable and safe movement throughout the station.
The new bridge has been designed to align with Amsterdam’s historic aesthetic while incorporating modern engineering standards focused on structural resilience, lifecycle performance, and public safety.

Mammoet’s Heavy Lift Expertise on Display
Mammoet was selected for the project due to its global reputation in heavy lifting, engineered transport, and complex urban operations. The company brings decades of experience executing technically demanding lifts in constrained, high-traffic environments.
For the Amsterdam Centraal project, Mammoet is deploying a combination of:
High-capacity cranes
Modular lifting systems
Precision-engineered lifting frames
Advanced load-control technologies
Some of the lifting systems involved are capable of handling loads approaching 1,200 tonnes, providing the control and redundancy required for work in the heart of a dense urban setting.
Planning, Phasing, and Urban Logistics
Executing a bridge replacement inside an active rail terminal requires meticulous planning. Mammoet’s engineers conducted extensive structural assessments, lift studies, and risk analyses before any on-site work began.
Key planning considerations include:
Scheduling major lifts during off-peak hours
Maintaining safe pedestrian and rail operations
Protecting adjacent historic structures
Coordinating closely with rail authorities and city officials
Safety remains a top priority throughout the project, with contingency plans in place for weather, technical variables, and operational constraints.
Equipment and Lifting Techniques
The removal and installation phases rely on Mammoet’s most advanced equipment and methods. Modular crane systems provide flexibility in positioning, while strand jacks are used for controlled lifting and lowering of heavy bridge elements.
Strand jacking allows loads to be moved with millimeter-level precision, offering increased safety margins compared to traditional lifting alone. This technique is particularly valuable in urban environments where tolerance for error is minimal.
By combining crane lifts with strand jack systems, Mammoet can ensure stable, predictable load movement while minimizing risk to surrounding infrastructure and the public.

Impact on the Local Community
The engineering behind this project is impressive, but its impact on the community is equally critical. Amsterdam Centraal Station is more than just a transport hub; it is a vibrant intersection of culture and commerce.
While the bridge replacement might cause temporary disruptions, the long-term benefits should enhance the overall experience for commuters and visitors. Local businesses may see fluctuations during construction, but improved pedestrian access will likely lead to a boost in foot traffic and the local economy in the long run.
Mammoet is committed to reducing disturbances, actively collaborating with local authorities to manage transport routes and support businesses throughout the construction phase.
Amsterdam Centraal Station sits at the intersection of transportation, commerce, and tourism. While construction activity may cause temporary disruptions, the long-term benefits are significant.
Once completed, the new bridge will:
Improve pedestrian flow and safety
Enhance accessibility across the station
Support increased passenger volumes
Contribute to long-term infrastructure resilience
Mammoet is working closely with local authorities to manage traffic flows, coordinate construction schedules, and reduce impacts on commuters and nearby businesses throughout the project.
Building the Future of Urban Infrastructure
This bridge replacement represents more than a single lift, it reflects how modern heavy-lift engineering supports the renewal of historic cities. By blending advanced technology with careful planning and respect for architectural heritage, Mammoet is helping modernize one of Europe’s most important transport hubs.
As the project progresses, the operation stands as a clear example of how precision lifting and logistics enable cities to evolve without compromising their identity.
Anticipation of a Modernized Transport Hub
As Mammoet undertakes this bridge replacement project at Amsterdam Centraal Station, they are showcasing not just their expertise in heavy lifting and logistics but also their commitment to enhancing urban infrastructure for future generations.
This ambitious project signifies a crucial step toward modernizing one of Amsterdam’s principal transportation links.
With the new bridge set to improve safety and functionality, there is a palpable excitement surrounding this significant engineering achievement.
The collaboration among architects, engineers, and heavy lifting specialists ensures that this project will meet and likely exceed expectations, marking a monumental highlight in Amsterdam's ongoing evolution.
Now, all eyes are on Mammoet as they work diligently to complete this vital bridge replacement, contributing to a better and more efficient urban experience for everyone.

About Mammoet
Mammoet is a global leader in engineered heavy lifting and transport solutions, specializing in the movement and installation of large, heavy, and complex objects. With a history spanning more than 200 years, Mammoet supports projects across energy, infrastructure, ports, mining, and heavy civil construction.
The company operates one of the world’s largest fleets of heavy-lift cranes, including some of the highest-capacity mobile and crawler cranes in operation today, along with strand jacks, skid systems, and modular transporters.
Mammoet’s expertise lies in combining engineering, logistics, and execution to safely deliver complex projects in challenging environments.
Frequently Asked Questions
Why is the bridge at Amsterdam Centraal being replaced?
The existing bridge no longer meets modern safety, capacity, and durability requirements for the volume of passengers using the station.
Why was Mammoet selected for the project?
Mammoet has extensive experience in heavy lifting within dense urban environments and specializes in complex infrastructure replacements.
What lifting methods are being used?
The project uses a combination of high-capacity cranes and strand jack systems to ensure precise, controlled lifting and placement.
How heavy are the bridge components?
Individual elements can weigh hundreds of tonnes, requiring specialized lifting systems and engineered lift plans.
Will station operations continue during construction?
Yes. The project is phased and scheduled to minimize disruption, with major lifts planned during off-peak periods.
What are the long-term benefits of the new bridge?
Improved pedestrian safety, increased capacity, better accessibility, and enhanced durability for decades of future use.
































Comments