Liebherr Upgrades STS Crane Cabin at Peel Ports Dublin to Enhance Operator Comfort
- Meagan Wood

- Jan 15
- 3 min read
30 Second Takeaway
Liebherr has completed a cabin upgrade on an STS crane at Peel Ports Group Dublin, focusing on operator comfort, ergonomics and visibility. Delivered through the Liebherr Transform service, the project demonstrates how targeted upgrades can improve working conditions and extend the value of existing port equipment.

Operator Comfort at the Centre of Performance
Liebherr has reinforced its commitment to operator-focused crane design with a recent cabin replacement project on an STS crane at Peel Ports Group Dublin, Ireland.
Recognising that crane performance is closely linked to operator comfort, Liebherr’s cabin solutions combine modern materials, ergonomic design and proven technology to support daily operations in demanding terminal environments.
A Tailored Cabin Upgrade
Designed Around Daily Operations
The replacement project was carried out with a clear focus on the operators working on the crane each day. The new cabin features:
An ergonomic control console designed to reduce fatigue
Panoramic visibility to support safe and precise crane operation
A modern climate control system, improving comfort across varying weather conditions
Together, these upgrades create a more supportive and productive working environment while maintaining the operational reliability required in busy port terminals.
Collaborative Project Delivery
Working Closely with Peel Ports Dublin
Liebherr worked closely with Peel Ports Group Dublin throughout the project to ensure the new cabin met specific operational requirements.
By aligning the upgrade with the terminal’s day-to-day workflows, Liebherr delivered a solution that improves operator wellbeing without disrupting crane availability or terminal productivity.
Part of the Liebherr Transform Service
Extending the Life of Existing Equipment
The cabin replacement forms part of Liebherr Transform, a service approach focused on upgrading and optimising existing cranes.
Transform projects allow customers to modernise key crane components such as cabins, drives and control systems ensuring equipment remains fit for purpose as operational demands, safety expectations and ergonomic standards evolve.
Supporting Long-Term Terminal Performance
Incremental Upgrades with Lasting Impact
Rather than full crane replacement, targeted upgrades like cabin modernisation provide ports with a cost-effective way to improve working conditions, enhance safety and extend the operational life of critical assets.
For Peel Ports Dublin, the upgraded STS crane cabin supports both operator wellbeing and consistent terminal performance.
About Peel Ports Group Dublin
Peel Ports Group Dublin operates one of Ireland’s key port facilities, supporting container, bulk and general cargo operations. As part of the wider Peel Ports Group, the terminal plays a vital role in Ireland’s trade connectivity, focusing on efficiency, safety and sustainable port operations.
About Liebherr
The Liebherr Group is a family-owned global manufacturer of construction machinery, material handling equipment and advanced technology solutions. Founded in 1949, Liebherr operates in more than 50 countries, serving sectors including construction, mining, maritime and industrial logistics.
Through its port equipment and service divisions, Liebherr provides new crane solutions as well as upgrade and modernisation services designed to extend equipment life, improve performance and support operator wellbeing.
Website: https://www.liebherr.com
Frequently Asked Questions
What was upgraded on the STS crane at Peel Ports Dublin?
Liebherr replaced the existing operator cabin with a new, modern cabin featuring improved ergonomics, visibility and climate control.
Why is operator comfort important for crane performance?
Comfortable working conditions help reduce operator fatigue, improve concentration and support safe, consistent crane operation.
What is Liebherr Transform?
Liebherr Transform is a service approach focused on upgrading and optimising existing cranes to meet current operational, safety and ergonomic requirements.
Does a cabin upgrade require full crane replacement?
No. Cabin replacements can be carried out as a standalone upgrade, extending the value and usability of existing cranes.
Who benefits from cabin modernisation projects?
Terminal operators benefit through improved safety, productivity and asset longevity, while operators benefit from better working conditions.
































Comments