top of page


Overhead crane renewal at Liebherr: Schmidbauer strong with Rieger & Moser as a team
Overhead crane renewal at Liebherr: Schmidbauer strong with Rieger & Moser as a team

cranehub
Aug 224 min read
Â
Â
Â


The second in the group: Bracht takes delivery of Liebherr LTM1750-9.1 mobile crane
The second in the group: Bracht takes delivery of Liebherr LTM1750-9.1 mobile crane

cranehub
Aug 144 min read
Â
Â
Â


Three Liebherr cranes on night shift for bridge construction
Ehingen (Donau), Germany, 1 August 2025 – During the construction of a major wildlife crossing, crane and transport company Affolter from Schüpfen (Canton of Bern) installed the substructure of the new bridge over six nights.

cranehub
Aug 43 min read
Â
Â
Â


Maximum Safety and Efficiency for Demanding Crane Applications
Lifting work with crawler cranes can be very challenging – especially on floating structures with varying inclinations or when lifting very long loads.

cranehub
Jul 304 min read
Â
Â
Â


Liebherr Fibre cranes Support the Construction of a New Tramway Bridge in Brest
A Liebherr 520Â EC-BÂ 20Â Fibre crane is currently supporting the construction of the new Schuman Bridge in Brest, France. Equipped with the advanced fibre rope technology, the crane impresses with its high load capacity, efficiency, and ease of use. Liebherr customer Saint-Yves Services confirms the benefits of the fibre rope in the demanding bridge construction and sets an example for forward-thinking solutions in infrastructure construction.

cranehub
Jul 293 min read
Â
Â
Â


Spectacular bridge swap with two Liebherr LR 11000 crawler cranes
As part of a complex infrastructure project, WASEL GmbH deployed two LR 11000 crawler cranes from Liebherr for a spectacular mission on the A42 between Bottrop and Essen. An old concrete pipe bridge needed to be replaced with a modern steel construction. The bridge connects refineries in the region with the Bottrop tank farm, crossing both the A42 and the River Emscher.

cranehub
Jul 245 min read
Â
Â
Â


Peck Tiong Choon expands crane fleet: New Liebherr LTM 1120-4.1 for demanding projects
As part of a major project, Peck Tiong Choon has invested in a new LTM 1120-4.1 from Liebherr. The powerful 4-axle crane not only enhances the company’s existing fleet but also marks a key step in modernizing its 100-tonne class. The decision to invest in Liebherr was based on more than 20 years of trusted partnership – characterized by technical excellence and outstanding reliability.

cranehub
Jul 163 min read
Â
Â
Â


Liebherr crane trio for business network
Richter Kran und Schwerlast GmbH, JenKran GmbH and GuR Saalfeld GmbH take delivery of new Liebherr mobile cranes.

cranehub
Jul 103 min read
Â
Â
Â


Fourth in the fleet: Rothmund takes another LTM 1230-5.1 from Liebherr
Rothmund GmbH und Montage has purchased another 230-tonne mobile crane from Liebherr. This is now already the fourth LTM 1230-5.1 in the Pforzheim-based company's fleet. The 5-axle model’s excellent flexibility, coupled with the 75-metre telescopic boom, were the key factors in the decision to invest in the same model again.

cranehub
Jul 83 min read
Â
Â
Â


A modernized fleet: new Liebherr LTM 1100-5.3 mobile crane for Würzburger Kranverleih
A modernised fleet: new Liebherr LTM 1100-5.3 mobilecrane for Würzburger Kranverleih

cranehub
Jul 43 min read
Â
Â
Â


Crane package for Transportes Crexell: five Liebherr cranes heading to Argentina
Transportes Crexell chooses the LTC 1050-3.1E as a low-CO2-emission alternative for end customers First electric crane headed to...
Clint Wood
Jun 243 min read
Â
Â
Â


Fleet renewed and expanded: Two new Liebherr mobile cranes for Mikschl Autokrane GmbH
Fleet renewed and expanded: Two new Liebherr mobile cranes for Mikschl Autokrane GmbH

cranehub
Jun 183 min read
Â
Â
Â


Sarens has completed a record-breaking decommissioning lift in Norway.
Sarens completes landmark decommissioning project at Wergeland Base

cranehub
Jun 172 min read
Â
Â
Â


From Haul to Install: Sterett Crane Powers Precision Bundle Replacement in Houston
Sterett Crane & Rigging recently completed a critical bundle replacement project for a major industrial client in Houston, Texas. The operation demonstrated the company’s full-service capabilities—spanning heavy haul transport and high-capacity lifting—with flawless execution and precision timing.

cranehub
Jun 113 min read
Â
Â
Â


Liebherr cranes at work constructing the final Skypark tower in Bratislava
An HC-L luffing jib crane is being used for the first time in Slovakia, where it will climb to an impressive height of 145 metres. A total of three Liebherr cranes have a key part to play in the construction of the Skypark Tower in Bratislava, the last of five high-rise buildings set to characterise the skyline of the Slovakian capital.

cranehub
Jun 53 min read
Â
Â
Â


Schwarze goes green: new LTM 1150-5.3 from Liebherr runs on HVO
Schwarze goes green: new LTM 1150-5.3 from Liebherr runs on HVO

cranehub
May 283 min read
Â
Â
Â


Inauguration of Project ONE: Europe’s Largest Crawler Crane
Sarens Deploys 2,500-Tonne Crawler Crane at INEOS Project ONE in Port of Antwerp

cranehub
May 193 min read
Â
Â
Â


Premiere: first Liebherr LTM 1110-5.2 with driver assistance systems shipped to Ulferts
Premiere: first Liebherr LTM 1110-5.2 with driver assistance systems shipped to Ulferts

cranehub
May 153 min read
Â
Â
Â


Precision and Teamwork: Stoddart Crane Hire Completes Complex Barge Lift in Scapa Flow
Precision and Teamwork: Stoddart Crane Hire Completes Complex Barge Lift in Scapa Flow

cranehub
May 132 min read
Â
Â
Â


Ever Wonder what it Takes to Build a Liebherr LR 13000 in the Field?
Ever Wonder what it Takes to Build a Liebherr LR 13000 in the Field?

cranehub
May 62 min read
Â
Â
Â
bottom of page